Registered: December 2005 Location: Echunga, South Australia Posts: 2,570 users gallery
The rear stabilizer pinned down and the PVA wood glue drying. The elevators are laid out and ready for placement over the plan as soon as the stab is moved.
Date: Mon March 3, 2008 | Views: 27 | Filesize:61.0kb, 149.6kb | Dimensions: 1280 x 850